PCL Construction contracted All Energy Contracting (AEC) and Stralis to complete construction of Gunsynd Solar Farm in Goondiwindi, NSW, Australia.
AEC was originally awarded underground reticulation, and installation of electrical cabling on the 111MW development. Due to our exceptional performance, and compliance with QA and QC protocols, AEC was awarded additional scope on the project, including civil works and O&M building construction.
Key Results:
- Trenching & Cable Installation Interface: Excavation and backfilling for DC and MV cable routes, installation of conduits, and interface coordination with electrical team
- Performance Recognition: AEC’s strong technical delivery, on-time performance, and safety culture resulted in extended scope allocation and positive client feedback.
- Quality Assurance: All works executed to the highest QA/QC standards, verified through Inspection Test Plans (ITPs), checklists, and client inspections.